Kitchen & bathroom renovation in Málaga
Partial renovations of kitchens and bathrooms in Málaga & the Costa del Sol, with 3D design up front, fixed-price quote and in-house execution. For owners who want to refresh the key room without touching the rest of the property.
What usually goes wrong (and how we prevent it)
Hidden costs
Fixed prices per trade. Appliances, sanitaryware and worktops are listed with brand and model.
Dust and noise across the home
Corridors are protected and the work area is sealed so you can keep living there with minimum disruption.
Delays because materials are late
Final selection is locked before starting, and delivery is scheduled to fit the works.
Leaks and drainage done poorly
Waste stacks and pipe work are replaced along the intervened section to prevent later damp problems.
When it fits
- Old kitchen with an awkward layout
- Bathroom with dated tiles, low tub or worn worktops
- Swapping the tub for a walk-in shower (with works)
- Refresh before selling or letting
- Adapting a bathroom for reduced mobility
- Opening the kitchen to the living area (non-structural)
How a kitchen or bathroom renovation runs
-
01
Site visit & measurements
We check existing services, measure and propose two or three layout options.
-
02
3D design & selection
Renders with furniture, sanitaryware and finishes to choose from within the budget.
-
03
Fixed-price quote
Written quote with brand and model of each item, schedule and payment terms.
-
04
Minor works licence
We file the paperwork at the town hall where required.
-
05
Execution on site
Coordinated trades, deliveries managed and a weekly photo report.
-
06
Handover & guarantee
Testing, final clean and written guarantee on the works and appliances.
At a glance
| Typical duration | Kitchen: 3–6 weeks · Bathroom: 2–4 weeks |
|---|---|
| Documentation | Technical memo, itemised quote and minor works licence |
| Scope | Design, furniture, sanitaryware, services, labour, trades and guarantee |
Frequently asked questions
Do I need a licence to renovate a kitchen or a bathroom?
Yes — a minor works licence (<em>licencia de obra menor</em>). We prepare the technical memo and pay the town hall fees before the works start.
Can I stay at home during the works?
For partial renovations, normally yes. The work area is sealed and services are turned off in short slots planned in advance.
How long until the kitchen or bathroom is ready?
A full kitchen renovation typically takes 3–6 weeks; a bathroom 2–4 weeks. The exact duration is written into the contract.
Can I supply my own appliances?
Yes. You can supply the appliances or let us source them. Either way the quote lists brand and model so pricing is transparent.
What guarantee do you provide?
Written guarantee on the works, plus the manufacturer warranty on appliances and sanitaryware, all delivered as a documentation pack.
Related services
Written by: PROYECTOS MÁLAGA technical team — chartered architects and technicians. · Last updated:
Request a quote — no obligation
Send us your enquiry and we will get back to you the same working day.