Building licences in Málaga: major and minor works

End-to-end handling of building licences before Málaga and Costa del Sol town halls. We draft the technical project, file the paperwork, pay the fees and follow up until approval — for both <em>obra mayor</em> (major works) and <em>obra menor</em> (minor works).

Building licences in Málaga: major and minor works

Major vs minor works: quick comparison

A quick table to know which route applies. If in doubt, the technical visit is always free.

Minor worksMajor works
Typical scopeFloor and tile changes, sanitaryware, kitchen, bathroom, paint, ACStructural works, layout changes, extensions, change of use, new build
DocumentationTechnical memo and quoteFull technical project signed by chartered technician
Site managementUsually not requiredMandatory (site director and execution director)
Typical duration15–30 days2–4 months
Fee guidanceFrom €300 plus town hall feesFrom €800 plus town hall fees and project budget
Full pageMinor works licenceMajor works licence

Major or minor works?

Start by knowing what you need

The distinction is not about budget: it depends on whether the works touch structure, layout or use. Before quoting anything we run a technical visit to define the licence.

File the right paperwork

Every town hall asks for slightly different details. We prepare the exact memo and drawings the municipality requires to avoid rejections and delays.

How we handle the licence

  1. 01

    Initial study

    Site visit, review of cadastre and local planning, decision on the appropriate licence with you.

  2. 02

    Technical paperwork

    Project or technical memo, drawings and annexes required by the municipality.

  3. 03

    Filing and fees

    Formal filing, payment of town hall fees and the ICIO (construction tax).

  4. 04

    Active follow-up

    We answer technical requests from the town hall and follow the file until approval.

Frequently asked questions

Can I start the works before the licence is granted?

No. Starting without a licence exposes you to work stoppage, fines and a harder later procedure. Some minor works can be started under a prior communication filing, and even then it must be registered first.

How long does a licence take in Málaga?

It depends on the town hall and complexity. As a guide, minor works are usually resolved in 15–30 days and major works in 2–4 months when paperwork is complete.

Do I need an architect for the licence?

For major works, yes — a technical project signed by a chartered technician and site management are mandatory. For minor works it is often enough to have a signed technical memo.

Are there fees on top of the town hall charge?

Yes — the processing fee plus the ICIO (a percentage of the works budget). Both are itemised in the quote we send before filing.

Can we legalise works already done?

Sometimes. Regularisation follows a specific procedure and not all works can be legalised. We always run a feasibility study first.

Written by: PROYECTOS MÁLAGA technical team — chartered architects and technicians. · Last updated: