ITE — Technical Building Inspection in Málaga

We carry out the Technical Building Inspection (<em>ITE — Inspección Técnica de Edificios</em>) in Málaga & the Costa del Sol: review of structure, façade, roof and services with an official report signed by a chartered technician and filed at the town hall.

ITE — Technical Building Inspection in Málaga

What we inspect

Structure

Foundations, columns, beams, slabs and load-bearing walls.

Façades

Cladding, external joinery, balconies, terraces and projecting elements.

Roofs

Waterproofing, structure, drainage and singular elements.

Services

Electrical, plumbing and drainage, gas, HVAC and lifts.

When the ITE is required

  • Buildings older than the age threshold set by the town hall
  • Renewals after the first inspection
  • Before applying for a major works licence
  • When the town hall requests it after inspection or complaint
  • To access rehabilitation grants

Our process

  1. 01

    Technical visit

    Walkthrough of the building and shared areas, with photo report.

  2. 02

    Technical analysis

    Assessment of structure, envelope, roof and services.

  3. 03

    Official report

    Drafting and signature of the report with result and required actions.

  4. 04

    Municipal filing

    Filing at the town hall and follow-up.

At a glance

Typical duration2–3 weeks after the site visit
Report outcomeFavourable, favourable with obligations, or unfavourable
ScopeInspection, chartered-signed report and municipal filing

Frequently asked questions

What outcomes can the ITE have?

Favourable (good condition), favourable with obligations (maintenance actions needed) or unfavourable (urgent safety works required). All are documented in the report.

Who is responsible for commissioning the ITE?

The community of owners or the sole owner of the building. We can coordinate with property managers to make it easier.

What if the result is unfavourable?

The required works and deadlines are identified. We can also draft the follow-up projects and coordinate the works until a favourable report is issued.

Does the ITE need to be repeated?

Yes. After the first inspection, subsequent inspections are due on a schedule set by each town hall.

Written by: PROYECTOS MÁLAGA technical team — chartered architects and technicians. · Last updated:

Request a quote — no obligation

Send us your enquiry and we will get back to you the same working day.

Anti-spam verification *
Call