Minor works licence (<em>licencia de obra menor</em>) in Málaga

Minor works licence in Málaga & the Costa del Sol for partial renovations of a home or unit: kitchens, bathrooms, floor changes, services and finishes. We prepare the technical memo and pay the fees before works start.

Minor works licence (<em>licencia de obra menor</em>) in Málaga

Advantages vs major works

Fast processing

Usually resolved in 15–30 days after complete filing.

Lower costs

Smaller project fee and lower town hall charges.

Simplified paperwork

A technical memo with quote and basic drawings is enough.

Quick start

Some works can start upon prior communication filing, depending on the town hall.

What counts as minor works?

  • Kitchen and bathroom renovations without structural changes
  • Floor and tile replacement
  • Electrical and plumbing service upgrades
  • Painting and interior finishes
  • Air-conditioning and heating installation
  • Terrace and balcony enclosures (subject to local rules)
  • Non-structural roof and façade repairs
  • Accessibility improvements

How we handle it

  1. 01

    Preliminary check

    We confirm the works can be processed as minor works.

  2. 02

    Memo &amp; quote

    Technical memo, quote and basic drawings as required by the municipality.

  3. 03

    Filing &amp; fees

    Formal filing and payment of fees and ICIO.

  4. 04

    Follow-up

    We answer any town hall queries until approval.

At a glance

Typical duration15–30 days after complete filing
DocumentationTechnical memo, quote and basic drawings
ScopeMemo drafting, filing and payment of town hall fees
Fee guidanceFrom €300 plus town hall fees

Frequently asked questions

Can I start the works upon filing?

In some town halls and for some works, yes — via prior communication or a "declaración responsable". Elsewhere you must wait for the resolution. We confirm which procedure applies.

How is this different from a major works licence?

Minor works do not touch structure, layout or use. Major works do, and require a full technical project and site management.

Do I need an architect for a kitchen or bathroom?

It depends on the town hall. Many require a technical memo signed by a chartered technician, which we draft when needed.

How much do I pay to the town hall?

A fixed processing fee plus the ICIO (a percentage of the works budget). We break both down in writing before filing.

Written by: PROYECTOS MÁLAGA technical team — chartered architects and technicians. · Last updated:

Request a quote — no obligation

Send us your enquiry and we will get back to you the same working day.

Anti-spam verification *
Call