Legalising unlicensed works in Málaga

We regularise unlicensed buildings and undeclared extensions in Málaga & the Costa del Sol: feasibility study, topographic survey, legalisation project and building age certificate, with follow-up until the town hall resolves the file.

Legalising unlicensed works in Málaga

Common conditions to be able to legalise

Provable age

You must prove the build date, usually via a building age certificate based on official records.

Compatibility with planning

The building must fit the current or original planning conditions.

Structural safety

We confirm there is no structural risk and the building meets minimum safety requirements.

No encroachment on public land

The building cannot occupy public roads, watercourses or coastal-maritime domain.

What we typically legalise

  • Homes built without a licence
  • Undeclared extensions and terrace enclosures
  • Non-compliant commercial or industrial units
  • Pools, sports courts and leisure facilities
  • Farm stores, greenhouses and rural buildings
  • Internal or façade modifications not filed at the town hall

Legalisation process

  1. 01

    Feasibility analysis

    Cadastre, planning and current condition. If not legalisable, we tell you before invoicing.

  2. 02

    Topographic survey

    Accurate measurement of the building so drawings reflect reality.

  3. 03

    Legalisation project

    Technical documentation reflecting the existing building and its compliance.

  4. 04

    Building age certificate

    Issued by a chartered technician to certify the build date.

  5. 05

    Administrative filing

    Filing at the town hall, fees and answers to requests.

  6. 06

    Final resolution

    Once regularised, you can hook up utilities, sign deeds and sell with legal certainty.

At a glance

Typical duration6–12 months depending on complexity
DocumentationFeasibility study, survey, project and building age certificate
ScopeAnalysis, drafting, filing and follow-up until resolution

Frequently asked questions

Can every building be legalised?

No. Buildings on public land, breaching setback rules or incompatible with planning cannot. That is why we always start with a feasibility study.

Can I sign a deed without legalising first?

A "declaración de obra nueva antigua" can be signed with a building age certificate if no urban planning proceedings are open. Legalisation provides stronger legal certainty.

What if the town hall has opened a file already?

Act quickly. We can submit technical documentation and pursue the most favourable regularisation path within the file.

How is it different from the age certificate?

The certificate certifies the build date; legalisation regularises the works at the town hall. They usually come together but are not the same.

Written by: PROYECTOS MÁLAGA technical team — chartered architects and technicians. · Last updated: